Crushed stone $40 to $75 per m³
Guides read in September 2026: Granular A about $35 to $55 per m³, delivery $75 to $200 a load. Haul-away prices vary too widely to average.
Reviewed 2026-09-28 · how we set these ranges
Every dig ends with two questions: what goes back in the hole and where the rest goes. The inspection and the 30-metre rule decide the timing and the place.
1 The pieces of the price
Crushed stone or Granular A
Per cubic metre, plus delivery
Crushed stone $40 to $75/m³ · Granular A $35 to $55/m³ · delivery $75 to $200 a load
Trucking the spoil
Per load or per truck hour
Too few published prices to average: ask for the load count and truck size in writing
Machine time
By the hour, with operator
Mini $65 to $150 an hour · standard $150 to $250 an hour
Fill placed near water
WAWA permit first
$25 for a single alteration
2 What's under your yard
The things nobody can see until the bucket goes in, and what to do about each before it does.
-
A brook, lake or wetland nearby
Any clearing, digging, fill or machine work within 30 metres of a watercourse or wetland needs a provincial WAWA permit first. The 30 metres is measured from the top of the bank, on the ground.
Before the dig: Measure before you book the machine. The landowner usually applies; a single alteration is $25.
-
Free fill from somebody else's dig
We found no provincial rule on trucking clean fill between private lots, and within 30 metres of water, placing fill needs a WAWA permit.
Before the dig: Ask your municipality before you accept fill, and check the 30-metre rule.
-
Buried lines
Gas, power, cable and old private lines can sit anywhere in a yard. NB Power says its lines can be buried as little as one foot down.
Before the dig: The contractor must have utilities located before digging (WorkSafeNB). Ask to see both tickets: Info-Excavation (3 working days' notice, valid to the end date on the request) and NB Power (five business days, valid 60 days, NB Power lines only). Mark private lines yourself.
-
Rock
We found no public source on how deep rock sits under any New Brunswick town, so nobody can promise a rock-free lot.
Before the dig: Get the rock clause in writing before the dig: how it is found, how the breaker time is logged and what it costs per hour.
3 Before the first bucket
Tick them off as you go. Nothing here is saved or sent anywhere.
4 Rules by place for this job
- Near lakes and flood-prone or tidal watercourses
- The province's guidelines do not allow infill to raise the grade within 15 metres of a lake, or within 30 metres of a flood-prone or tidal watercourse.
- Fredericton
- New water and sewer services are installed by the City's Water and Sewer Division; a site servicing plan goes in with the building permit, and the customer pays once the work is done.
- Anywhere else
- We found no excavation-specific rule for Dieppe, Sussex, Miramichi or other towns: ask your municipality or Regional Service Commission before the machine arrives.
What the written quote should name
- The backfill material and where it comes from
- When backfill happens relative to the inspection
- The number of loads out and their destination
- Whether any spoil stays on the lot
- Compaction and final grade
More on the work itself: Backfill & Haul-Away
Questions people ask
When can the foundation be backfilled?
After the footing and foundation inspection; Regulation 2021-2 calls for it before any backfilling begins.
Can fill go near the river on my lot?
Not within 30 metres without a WAWA permit, and the guidelines bar raising the grade within 30 metres of a flood-prone or tidal watercourse.
How many loads will my dig make?
We found no published figure; ask the contractor for the load estimate and truck size in writing.
Want this done at your place?
Tell us what needs digging and we'll pass it to local New Brunswick excavation contractors for a written quote. We send it out to local contractors for you. Free, no pressure.
Plan another job
- Foundation dig$7,500 to $30,000 for a whole-house dig
- Water or sewer trenchMini $65 to $150 · standard $150 to $250 an hour
- Septic dig$3,000 to $12,000 for the excavation
- Lot clearing and gradingMini $65 to $150 · standard $150 to $250 an hour
- Driveway dig and base$1,500 to $5,000 for excavation and base
- Weeping tile and drainage digMini $65 to $150 · standard $150 to $250 an hour
- Rock breaking$200 to $300 an hour for a breaker